| Re-Lining Specification.
The relining works involve the cleaning and descaling of the required
section of drainage to be relined. This work is carried out by way of a
combination of Electro-mech machining and High Pressure Water Jetting to
remove any signs of scale and silt deposits and to leave the pipe
cleaned and prepared for the relining process.
The UPVC relining sleeve is then installed in-situ by way of air
inflation and then cures over a time period of up to three hours per
run. The inflation tube is removed on completion of the curing period
and the newly relined section is then cleaned to remove any excess
resin solution.
High-level gutter cleaning

For quick and easy high-level gutter cleaning, we use our
'cherry-picker', high-lift platform. |